old machines

old machines

Re-Engineering

Many of the older industrial control systems today may be very difficult to service due to obsolete components. To replace these control systems can prove to be very costly in terms of both material costs, labour and down time. To avoid this we offer Re-Engineering as an alternative solution. We can re-engineer a wide variety of equipment, designed to meet your exact requirements. The Re-Engineered product can either match or improve upon the existing obsolete equipment's functionality. A Re-Engineering project can be approached in two different ways. New equipment can be designed and built ready to replace the obsolete equipment with identical board size, mounting, connections and functionality. Existing equipment can be modified to accept currently available components. The modified equipment can then be put back into service to provide continued operation in the future. In both cases down time is kept to a minimum and the equipment fitted will be easy to service.